Floor heating mushroom plate, you installed right?


1. Leveling: The ground must first be cleaned up and must be flat, and the flatness error is within 1cm.

2. When laying: the grooves between the mushroom plates should be aligned, the connection should be tight, and the spacing between the plates should be less than 2cm.

3, in the EPP mushroom head floor heating plate between the seam, floor heating plate and the sound insulation plate between the seam paste waterproof tape. Squeeze out the bubbles in the tape and smooth the folds of the tape. If the folds cannot be smoothed, a layer of tape can be attached for sealing.

4, buried, fixed expansion joints at the mushroom head plate, or preset wooden slats to be taken out after the construction of the concrete protective layer. Formwork shall be erected at the door opening, and the height of formwork shall be greater than the height of concrete.

5. Check: Whether all the seams in the room are sealed. If there are bubbles, folds, etc. on the tape, cover a certain length of waterproof tape on the outside to strengthen the seal.

6. Detail treatment: If there is a threading pipe on the ground, the sound insulation board shall be cut according to the direction of the on-site pipeline to ensure that the mushroom head board is fully spread around the pipeline, and the EPP floor heating mushroom head board shall be sewn and stuck with waterproof adhesive tape.

7. After processing: The site is closed, preferably for personnel to enter and exit within 24 hours, and it should be windproof.


 

Key words:

SAF Coolest v1.3.1.2 设置面板GAGSD-ZGYF-JXAEE-ZWE

违禁词: First, best, first-class, leading, unique, king, leader, leader, extreme,

无数据提示

Sorry, the current column is being updated, please look forward to it!

You can view other columns or returnHome Page

V1.3.1 SVG图标库请自行添加图标,用div包起来,并命名使用